Assignment A: Perform line break (see room 5)

10 min

Situation:

see installation room 5: The leaking gasket at pump P101B needs to be replaced.

Assignment:

On the whiteboard, select the tools you need to safely perform the line break to replace the gasket. Note the numbers of the selected tools on your sheet.

Previous
Next