Assignment A: Perform line break (see room 5)
10 min
Situation:
see installation room 5: The leaking gasket at pump P101B needs to be replaced.
Assignment:
On the whiteboard, select the tools you need to safely perform the line break to replace the gasket. Note the numbers of the selected tools on your sheet.